• B-One

      Project

      With its 500 state-of-the-art workspaces, "B-One"–the name of the new Berlin Hyp headquarters–consolidates corporate locations and represents cooperation. With their design, C.F. Møller Architects have created a striking, urban gateway into the western city center. Accordingly, our lighting concept gives special consideration to external effects.
      C.F. Møller cooperated by designing the interior architecture in such a way that we were able to integrate all aspects of our lighting design particularly well. The flexible floor plans for offices, private spaces and conference areas, such as the multi-level "town hall" and the outdoor spaces on each floor, also harmonize in regard to light. Digital components for climate and light are part of our concept, and sensors are integrated into the office lights.
      With B-One a holistic environmental and resource-saving concept has been put in place.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2020 — 2025
    • Konferenzzentrum Mauerstrasse

      Project

      3 ministries share a large conference center in Berlin Mitte on Mauerstrasse. We were able to optimize the daylight glare with fabric louvers. The lighting can create a wide variety of moods and specifically increase the blue of the sky light. The pictures show the full spectrum of possibilities.
      In addition, there was the development of special luminaires: A luminous mobile with dichroic filters and solid glass blocks, and glass luminaires filled in the entrance to the Ministry of Family, Women, Children and Senior Citizens.
      Both luminaires were developed by us for the project.

      Building type
      Of­fice, Lu­mi­naire
      Location
      Europe, Germany, Berlin
      Project time frame
      2021 — 2023
    • Atrium Tower

      Project

      Extensive modernization of the former Debis building with the Renzo Piano Building Workshop. Kardorff Ingenieure supervised the DGNB gold-certified project from planning to execution for the 22-storey, 106 meter-high office tower, the spectacular atrium with adjacent lobbies and entrances, as well as the new exterior illumination. Already completed in 2015, the Sky Office showroom is located on the eleventh floor.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2015
    • Federal Ministry of Education and Research

      Project

      Between the Charité and the banks of the Spree, not far from the main train station, is the new location for the administrative seat of the Federal Ministry.
      The building has been given “gold” according to the standards for sustainable construction of federal buildings (Nachhaltiges Bauen für Bundesgebäude / BNB); certification according to “DGNB Gold” is being striven for.

      Building type
      Of­fice
      Location
      Europe, Germany, Berlin
      Project time frame
      2014
    • InterCityHotel Berlin

      Project

      This hotel belonging to the Steigenberger Group is part of the Europacity development around Berlin’s main train station. The facade lighting designed by Kardorff responds to the different vantage points from which the building can be viewed. The hotel was awarded the gold DGNB sustainability certification by the German Sustainable Building Council.

      Building type
      Hos­pi­tal­i­ty
      Location
      Europe, Germany, Berlin
      Project time frame
      2013
All results