• Deloitte Digital and Smart Factory

      Project

      The “Deloitte Digital” and “Smart Factory” spaces have been completed at the Heinrich Campus in Düsseldorf. These two new work environments take the concept of “New Work” literally: they are modern office spaces that open up new fields of work at the intersection of digital transformation, production, and design.
      The spatial concept translates digital workflows into vivid objects and identity-defining architecture. The lighting is interactive, featuring dynamic color-changing fixtures. The exhibition in the “Smart Factory” is accentuated by dynamic patterns of color and movement.
      Lighting fixtures from the departments’ previous locations were reused in the new spaces.

      Building type
      Of­fice, In­dus­try
      Location
      Europe, Germany, Düsseldorf
      Project time frame
      2024 — 2025
    • ZEBRA Deloitte

      Project

      The facade in its progression, materials, lighting and detail was designed by us. It is the unique feature of the ZEBRA located on Frankfurt's Europaallee. The lighting for the work areas reflects the work environments developed by Deloitte and illuminates the different areas with spotlights and decorative luminaires to give expression to the utmost individualization of each area.

      Building type
      Of­fice, Ur­ban Space, Lu­mi­naire
      Location
      Europe, Germany, Frankfurt am Main
      Project time frame
      2019 — 2022
    • Heinrich Campus

      Project

      The workplace as a stage with the most diverse range of areas.
      The lighting design here is based on a system of busbars that are very flexibly fitted with different kinds of luminaires.
      A luminous color of 3000 K and the brilliance of the luminaires, together with the materials, create a special kind of coziness with a highly pleasant liveability in the rooms.

      The foyer and the two floors in the entrance area are multifunctional. A grid of flush-mounted busbars and downlights are integrated into the lamellar structure of the ceiling.

      Building type
      Of­fice
      Location
      Europe, Germany, Düsseldorf
      Project time frame
      2019 — 2022
All results